cropped-LOGO.png
Search
Close this search box.

Quality Control

Quality is our TOP priority

Incoming Material Control - 100% Testing for Electric Board

Testing for electric board: There is a temperature balance room specialized for testing electric boards based on different ambient temperatures.

homepage line icon
Each electrical panel is temperature tested three times before assembly:
cooling icon

Cooling test: under minus 25 ℃ for 4 hours

temperature cooling icon

Heating test: under 45 ℃ for 4 hours

icon 1

Normal temperature test for 4 hours​

After the temperature tests are passed, the electric board will be sent to do the performance test before assembling.​

Avoid Scratches and Dents in the Casing

Attention to detail is a crucial part of the transport and production process

homepage line icon

Material Transport Control

Each casing is transported by a tooling car

Automatic Conveyer Belt

After assembly, the unit will be sent to the 2nd floor to do a cooling test by conveyor belt

Automatic Packaging Machine

Vacuum suction cup lifting machine to pack the unit, it is to avoid scratching caused by manual moving

Automated Transport Warehouse

After packing, the unit will be sent to the warehouse by automatic conveyor belt

Guidance from Experienced Welders

For welding operations, we have invited an engineer who has been involved in welding at BMW in Germany for 25 years to supervise the work, so that the leakage failure rate of our products is less than 0.1%.
Each of our welding staff is strictly trained and welds according to standard procedures to guarantee the quality of our products.​

soldered
labs control

Cooling Tests and Safety Tests

We have always believed that only products that undergo rigorous testing can survive in the market. The production will be sent to the second floor to do at least twice the cooling test. And the safety tests after the cooling test, our products have to go through several critical safety tests: the first cooling test, the second HI-POT test, the third double-check of product configuration, the fourth performance test, and the fifth high voltage test, in the case of electricity leakage or welding point crack during the cooling test.​

Well-equipped Science Lab

We have three scientific laboratories to cater to different areas of testing, including an aging lab, a general lab, and a power version testing lab. we are one of the few companies in the industry to have our own lab.

labs

- Tracking -

Quality Control During Producing–Quality Tracking

homepage line icon
icon 2

Tracking Card

Each unit will have a quality tracking card so that the QC won’t miss anything.

icon 3

Spot Check

After the order is completed, we will do the spot check, all of the units need to be re-checked, even re-work if one of the units has a performance problem during checking.

icon 5

Aging Test

Randomly choose some units from the mass production for the aging test. It would be helpful for us to perfect our products. Most importantly, if the product has any problem, we also could provide the solution to our customers before they get feedback from the market.

Get A Free Quote:

Our team will answer your inquiries within 12 hours.